Home
/
News
/

JKX fails to sidetrack new well in Russia

JKX fails to sidetrack new well in Russia

7 March 2019

JKX Oil & Gas (JKX LN) reported on March 7 a
technical failure during a workover of well #5 at its Koshekhablskoye field in
Russia. After sidetrack drilling at a total depth of 5,204 m and satisfactory
geological results, the well suffered from drill pipe parting that left a 1,119
m fish in the well. The workover has been “suspended pending inspection of the
drill pipe,” JKX reported. 

 

Alexander Paraschiy: The failure is clearly negative news, but not a disaster for JKX since
well #5 was not contributing to the company’s production for at least five
years. With the failure, JKX is unlikely to see any increase in natural gas
production in Russia this year. But given that profit from its Russian gas
production is not significant for JKX (1H18 operating profit in Russia was a
fraction of its Ukraine profit, despite higher hydrocarbon output in Russia),
the accident’s consequences won’t be material on the company’s P&L.

Latest News

News

23

02/2022

Separatists may claim entire territories of two Ukrainian regions

Russia has recognized “all fundamental documents” of the self-proclaimed Donetsk and Luhansk People’s Republics (DNR...

News

23

02/2022

U.K. to provide USD 500 mln loan guarantee for Ukraine as IMF mission starts

The British government is going to provide up to USD 500 mln in loan guarantees...

News

23

02/2022

MinFin bond auction receipts jump to UAH 3.5 bln

Ukraine’s Finance Ministry raised UAH 3.3 bln and EUR 7.2 mln (the total equivalent of...