Turboatom (TATM) said on Friday that they were contracted by the Tajikistan Department of Energy to provide six turbines and hydraulic locks for the Nurek hydroelectric power station over 2009-2012. In related news, Turboatom said that it might create a joint venture in Tajikistan to design and produce turbine equipment for small and medium-size hydroelectric power plants.