Головна сторінка
/
Новини
/

Ukraine To Increase Nuclear Power Production

Ukraine To Increase Nuclear Power Production

10 May 2008

The Fuel and Energy Ministry and the Energoatom Nuclear Generation Company presented the Cabinet a draft strategy on nuclear sector development until 2030. The plan would put 11 new reactors online by 2030 and prolong the term of safe operation for acting nuclear reactors. Concorde Capital: Increasing Ukraine’s nuclear capacity is unlikely to harm thermal generation, as there will be no significant increase of nuclear capacity by 2030. Currently, Ukraine has 15 acting nuclear reactors with a total installed capacity of 13.82 GW. By 2030, 8-10 (8,82-10.82 GW) will be decommissioned. According to the Fuel and Energy Ministry’s proposition, these reactors will be replaced by 11 new units, with an estimated total capacity of 11 GW. Thus, Ukraine?s total nuclear capacity could increase to 14-16 GW (by 2-16%).   Look for our Energo report, with a comprehensive review on the entire sector and all thermal generating companies, tomorrow.

Останні новини

News

23

02/2022

Separatists may claim entire territories of two Ukrainian regions

Russia has recognized “all fundamental documents” of the self-proclaimed Donetsk and Luhansk People’s Republics (DNR...

News

23

02/2022

U.K. to provide USD 500 mln loan guarantee for Ukraine as IMF mission starts

The British government is going to provide up to USD 500 mln in loan guarantees...

News

23

02/2022

MinFin bond auction receipts jump to UAH 3.5 bln

Ukraine’s Finance Ministry raised UAH 3.3 bln and EUR 7.2 mln (the total equivalent of...